Location

Berg / Germany

Reed bed STP with integrated sludge
mineralization

Design and execution supervision of the STP, the waste water pressure line and 16 pumping stations. The reed bed serves the village of Berg since 1997 with highest efficiency. After 25 years of operation the plant is still operating in original condition without any technical modification. Between 1987 and 2013 Mr Wolf designed and supervised the construction of more than 600 reed beds of all sizes.